Italy’s Conto Termico 3.0: Applying for a Heat Pump Boiler Replacement

  • 2
  • November 23, 2026

If you are replacing an existing boiler in Italy, confirm the Conto Termico 3.0 route before designing the heat pump system. The grant calculation depends on the appliance and the project. The application also needs evidence about the heating installation that was there before the work.

Start with the old system and the applicant

GSE states that the existing winter heating system must have been installed and working when the decree entered into force on 25 December 2025. Record the building, existing heat generator and services it supplies. A home replacing its primary space heating has a different file from a project installing only a domestic hot-water appliance. Businesses should check the pre-application requirement in Article 25 before work starts. Public-sector applicants can review the reservation route where applicable.

What the 65% ceiling means for a quotation

For ordinary projects, the decree caps the incentive at 65% of eligible expenditure. The technical annex calculates heat pump incentives using the applicable equipment category, declared rated thermal output, seasonal performance and climatic conditions. For electric heat pumps, GSE asks for the manufacturer’s P-rated value at the standard Ecodesign conditions for the average climate. Ask the installer to identify the relevant product data before estimating the incentive.

For example, €12,000 of eligible costs gives a ceiling of €7,800. If the relevant calculation produces €5,200, €5,200 is the working estimate, subject to eligibility checks. For private applicants with an approved total incentive of €15,000 or less, the decree provides for payment in a single instalment.

Build the GSE file before removing the boiler

  1. Keep photographs of the old generator and its nameplate, the installation address and evidence of the existing system.

  2. Obtain the new model’s product fiche, technical data, installer declaration and itemised quotation. Ask how the works and payment records will be documented.

  3. Keep final invoices, bank transfer receipts and the dated completion documents. For direct access, submit in Portaltermico within 90 days of completion.

If another public incentive or tax deduction is planned for the same works, check the stacking rules in Article 17 before including both in the financing.

When to consider GreenTherm One

For a home that needs heating and domestic hot water, we recommend assessing PHNIX GreenTherm One. It brings key hydronic components together in an outdoor R290 unit, which can simplify the layout when replacing a boiler and rearranging the plant area. Ask for the exact model’s rated power, seasonal performance and capacity at the design flow temperature. Have the installer confirm how domestic hot water is served and what equipment remains in the system before preparing the GSE file.

PHNIX GreenTherm One integrated R290 outdoor heat pump
GreenTherm One is an integrated residential option. Ask for the exact model’s Ecodesign information when preparing the GSE application.

Sources

Policy checked on 23 November 2026. Check the programme’s current rules and the exact model before committing.


Interested in PHNIX Heat Pump Products?

We promise that the collection of your information is solely for the purpose of contacting you and helping you better understand us. By sending the message, you indicate your consent to our "Disclaimer" and "Privacy Policy".
Consult
Now