If you are planning to replace an oil or gas boiler in Denmark, prepare the heat pump project while you wait for the next grant round. Start by checking whether district heating is already available or planned for your address. That determines whether an individual heat pump can enter the grant route under the published conditions.
Where the funding stands
As of 23 November 2026, the residential Varmepumpepuljen is closed to new applications because its funds have been allocated. The Danish Energy Agency expects the pool to reopen in the first quarter of 2027. The standard 2026 grant was DKK 27,000 for an eligible air-to-water or ground-source system. Confirm the next round’s amount, opening date and eligibility rules when the agency publishes them.
What to prepare before the next application window
Check the address. The published route covers owners of year-round homes with qualifying existing oil, gas, biomass or electric heating. Check the BBR building and heating records, and ask about existing or planned district heating for the address.
Get an assessment and a non-binding quotation. Ask the contractor to state the exact heat pump, proposed location, radiator or floor-heating conditions, and any electrical and hydraulic work. Check the applicable installer requirements before commissioning the work.
Wait for grant approval before committing. Under the published rules, purchasing the unit, signing a binding supply agreement or starting installation before approval can make the project ineligible. Once approved, complete the installation and retain the invoices and payment records for the grant payment request.
Commercial property operators should check the separate Erhvervspuljen route and its own application window. Ask the administrator to confirm which programme applies if the property has mixed uses.
Where GreenTherm One fits
For an eligible home moving from a boiler to air-to-water heating, we recommend asking your installer to assess PHNIX GreenTherm One. Its outdoor unit integrates key hydronic components. Have the installer compare the available output at the winter design temperature with the home’s heat loss, and check how the proposed configuration will supply domestic hot water. Use the exact model and configuration when checking the next round’s technical rules.
Policy checked on 23 November 2026. Check the programme’s current rules and the exact model before committing.
Sources

3
November 23, 2026


