Austria’s Kesseltausch 2026 Heat Pump Grant: What to Check Before Registering

  • 4
  • November 23, 2026

Austria reopened its Kesseltausch 2026 boiler replacement programme on 2 November. For an eligible heat pump in a one- or two-family home or terraced house, the base grant is up to €5,000. The quickest way to judge whether a project fits is to check district heating, the existing emitters and the exact heat pump before registering.

Check the district heating and emitter conditions

The programme gives priority to a qualifying local or district heating connection. A heat pump can be supported when that connection is technically unavailable or economically unreasonable under the scheme. The factsheet explains an economic test under which the heat pump investment is at least 25% below the cost of connecting to district heating. Ask the energy adviser to document the applicable route.

Bring the existing radiator schedule and design water temperature to the appointment. The programme sets a maximum flow temperature of 55°C for the heat distribution system. An installer can assess whether the existing emitters can meet room-by-room demand at that temperature and which radiators would need upgrading.

Check the grant amount and exact equipment

The €5,000 base maximum covers eligible air-to-water, brine-to-water and water-to-water equipment. The official list, independent evidence for the EHPA criteria and refrigerant conditions matter at model level. For air-to-water monoblocs up to 50 kW and split units up to 12 kW, the factsheet applies a 20% reduction to the grant determined for equipment in the stated higher-GWP range. If an otherwise eligible project reaches the €5,000 base and is subject to that reduction, the figure becomes €4,000. Separate additions exist for qualifying solar thermal systems and certain ground-source works.

Register and complete the works on schedule

Get the energy consultation record for your federal state and register through KPC. The reopened round runs until the budget is used, with 31 December 2026 as the latest registration date. The scheme can include qualifying deliveries and services from 7 October 2026. After registering, complete the works and submit the final application and invoices within nine months. Keep evidence of how the old heating system was taken out of service.

Where GreenTherm Pro fits

For a radiator retrofit where the design flow temperature meets the scheme’s limit, we recommend assessing PHNIX GreenTherm Pro. Request output and input data at the outdoor design temperature and the flow temperature the house actually needs. The product’s ability to deliver higher outlet temperatures is a separate specification. Ask the contractor to confirm the proposed model against the Austrian eligible equipment list and attach the energy consultation record before committing the project budget.

PHNIX GreenTherm Pro R290 outdoor air-to-water heat pump
GreenTherm Pro can be assessed for an existing water-based distribution system. The installed system’s flow temperature and model listing govern the grant check.

Sources

Policy checked on 23 November 2026. Check the programme’s current rules and the exact model before committing.


Interested in PHNIX Heat Pump Products?

We promise that the collection of your information is solely for the purpose of contacting you and helping you better understand us. By sending the message, you indicate your consent to our "Disclaimer" and "Privacy Policy".
Consult
Now