Poland’s Clean Air Heat Pump Grant: Funding Tiers and the ZUM List

  • 2
  • November 23, 2026

In Poland’s Clean Air programme, Czyste Powietrze, two checks affect a heat pump quotation from the outset. The household’s funding tier sets the cost share, and the exact equipment must meet the programme’s model-list rules. A clear quotation should identify both the proposed system and the documents the owner will need.

Check the home and the applicable funding tier

The July 2026 programme documents apply to new applications under the round that began on 20 July 2026. The main pathway is for eligible owners or co-owners of a single-family home or a qualifying separately registered dwelling in one. Check the ownership-period rules and exceptions, household income and the building’s heating demand. Ask the programme operator or regional fund whether the energy audit calls for insulation or other work alongside the heating replacement.

Grant levels for higher-efficiency air-to-water heat pumps
Funding tierMaximum share of eligible costsMaximum grant
Basic40%PLN 14,080
Elevated70%PLN 24,640
Highest100%PLN 35,200

Highest-tier condition. In addition to meeting the applicant criteria, the home must start above 140 kWh/m² per year in useful energy demand for space heating. A project that replaces the heat source must also include building energy-efficiency works, such as insulation, that reduce the indicator to 140 kWh/m² per year or less and by at least 40% from the pre-works level. A heat pump replacement alone does not qualify at this tier. Both targets apply to the heating-demand indicator assessed by the audit. See the official programme rules.

An applicant in the elevated tier with PLN 26,000 of qualifying costs in this category would calculate PLN 18,200 before any further project checks. That falls below the PLN 24,640 category ceiling. For other equipment types and work items, use the corresponding row in the current official table.

Verify the ZUM entry at the relevant invoice date

Ask the installer to quote the exact manufacturer model and configuration. Check that reference in the ZUM equipment register, capture the entry, and keep the invoice and payment documents. The programme’s instructions tie eligibility to listing on the invoice or equivalent document date. They also describe a specific exception where an eligible model was listed at the advance invoice date and was later suspended or removed, provided the final invoice is submitted for settlement. Ask the regional fund how it applies to your file.

Where GreenTherm Pro fits

For a home replacing an old heat source and keeping a water-based heating circuit, we recommend assessing PHNIX GreenTherm Pro. Give the installer the audit’s heating demand and proposed flow temperature. Ask for the exact model, the relevant seasonal performance and available capacity at the design conditions. The installer can then cross-check those documents and the ZUM entry before issuing the quotation.

PHNIX GreenTherm Pro R290 outdoor air-to-water heat pump
GreenTherm Pro is an air-to-water option for a hydronic retrofit. Use the exact model and invoice date for the ZUM check.

Sources

Policy checked on 23 November 2026. Check the programme’s current rules and the exact model before committing.


Interested in PHNIX Heat Pump Products?

We promise that the collection of your information is solely for the purpose of contacting you and helping you better understand us. By sending the message, you indicate your consent to our "Disclaimer" and "Privacy Policy".
Consult
Now